Perkasie Whole-Home Renovation Blends Old and New Construction
PERKASIE, PA — Work continues on a full-home renovation and addition in Perkasie that is giving the Brett King Builder team the kind of challenge we enjoy most: updating an older Bucks County home without stripping away the details that make it worth preserving.
At this stage of the project, much of the finish work is still ahead of us. What is visible now is the part homeowners rarely get to see once a renovation is complete — the structure, framing, connections, openings and careful adjustments required to make an older house work as one cohesive home.
The scope is extensive. The project includes a new addition and basement area, major structural reframing, floor leveling, replacement of aging mechanical and plumbing systems, new electrical work, Marvin windows, a natural slate roof, custom exterior doors, plaster finishes, wide-plank white oak flooring, a new kitchen and renovated bathrooms.
Building Around What Is Worth Keeping
One of the first priorities was determining which parts of the original house needed to remain and how the new work could be built around them.
Inside the living room, demolition exposed the original stone walls and heavy timber ceiling beams. Those features are not decorative reproductions. They are part of the original structure and character of the house, so the work around them has to be planned accordingly.
As the floors were opened and reframed, temporary shoring was installed where needed so the existing structure could remain supported while new framing was tied into it.
This is where renovation work differs greatly from new construction.
On a new house, dimensions begin on paper and the structure follows them. In an older house, you open a wall and find out what was actually built. Floor heights may change from one room to another. Framing may not land where expected. Stone and masonry do not move simply because a new floor plan says they should.
The design may establish the goal, but craftsmanship is what makes that design fit the existing building.
The Addition Is No Longer Just Framing
From the exterior, the new addition is now becoming a recognizable part of the house.
Earlier phases showed the foundation and rough framing going up alongside the original structure. The latest progress photos show the addition weather-wrapped, new windows installed, rooflines established and trim beginning to define the gables and covered porch.
The important part here is not simply adding square footage.
The roof pitches, trim profiles, window proportions and overhangs all have to relate to the original house. If those details are wrong, an addition can look attached rather than integrated.
That is one of the reasons we spend so much time studying the existing architecture before exterior finish work begins.
Marvin Windows Set the Proportions
The new Marvin windows are also starting to change the appearance of the addition.
Some of the openings are large, including the new window wall shown in the current construction photos, while others are sized and positioned to work with the scale of the original house.
The architectural plans called for several new and enlarged openings, including the bay window addition and new windows coordinated with raised floor elevations and interior countertop heights.
Window installation on a project like this is not just a matter of placing a unit into a framed opening. Header heights, exterior trim, interior finishes, roof geometry and existing masonry all affect where a window ultimately sits.
Getting those relationships right now prevents the finished work from looking forced later.
Raising and Leveling the Existing Floors
Some of the most significant work happening inside will eventually be almost impossible to notice.
Portions of the existing floor structure are being rebuilt and raised so different sections of the house align properly. The construction documents call for existing joists to be removed in certain areas and the floor raised to the main level, along with structural changes around the fireplace and adjoining spaces.
That work matters because floor elevation affects nearly everything that follows.
Door openings, stair geometry, cabinetry, windows, base trim and transitions between rooms all depend on the framing being correct.
You do not fix those problems with finish carpentry. They need to be solved while the structure is open.
Connecting the Addition to the Original House
Several new openings have also been created through the original walls to connect the addition with the existing floor plan.
In the progress photos, you can still see original brick and plaster at the edges of some of these openings while new framing is being installed around them.
This is another area where the design-build process becomes especially valuable.
A drawing can show where the new opening belongs. Once the wall is opened, the field conditions tell us how that opening actually needs to be supported, trimmed and integrated.
The objective is straightforward: when the house is finished, the circulation should feel natural enough that you do not stop and wonder which rooms were original and which were added.
New Stair Framing Changes How the House Moves
The new stair work is another major piece of the interior reconstruction.
The current photos show the framing still exposed, which makes it easier to understand how much coordination happens around a staircase. Floor openings, landings, railing locations, headroom and nearby doorways all have to work together.
The plans include new stair components and changes to existing stair conditions as part of the broader reorganization of the first and second floors.
A staircase is one of those parts of a renovation where being close is not good enough.
The framing has to be right before finish carpentry begins.
Built-Ins Return Detail to the Living Room
Although much of the house is still in rough construction, finish details are beginning to appear in a few areas.
New built-in cabinetry is taking shape around the living-room fireplace, positioned against the original stone wall beneath the existing timber beams.
That combination says a great deal about the approach to the whole project.
We are not trying to turn an older Bucks County house into something that feels newly manufactured. The new cabinetry should look intentional beside the old masonry. The new trim should make sense with the existing proportions. Modern systems should improve the way the house performs without becoming the visual story of the room.
Good renovation work is usually quieter than people expect.
The goal is not to make every new detail announce itself.
The Kitchen Is Being Built From the Room Out
The kitchen will eventually become one of the most finished areas of the house, but the design work behind it began long before cabinets arrived.
Plans call for new cabinetry and soapstone countertops, along with significant built-in storage and cabinetry coordinated around the windows, appliances and circulation through the room.
The current kitchen design set includes a detailed floor plan, cabinet elevations and renderings developed specifically for the space.
Those drawings are important, but the real work is making sure the room we build matches the room that was designed.
That means confirming dimensions after demolition, coordinating rough plumbing and electrical locations, checking window heights, allowing for finished flooring and making sure every cabinet has somewhere sensible to land.
Cabinet installation should be the confirmation of good planning, not the moment problems are discovered.
Why This Stage of a Renovation Matters
This Perkasie renovation still has a long way to go before the house is finished, but this stage tells much of the construction story.
The slate roof, Marvin windows, custom exterior doors, cedar siding, copper gutters, plaster walls, resawn white oak flooring, soapstone and finish carpentry will eventually be the parts people notice.
Right now, our attention is on the work underneath them.
Framing has to be straight.
Floors have to be level.
Openings have to line up.
Loads have to be carried correctly.
Old materials have to be protected where they are being preserved.
And every new part of the house has to connect properly to something that may have been built generations ago.
That is the part of design-build work that photographs do not always explain.
The finished product depends on hundreds of decisions made while the walls are still open.
The renovation is now far enough along that the new layout and exterior form are becoming clear, but there is still enough exposed construction to see exactly how the transformation is being built.
For us, that is one of the most interesting points in any renovation.
The design is no longer just on paper.
It is becoming the house.